PM Surya Ghar: Muft Bijli Yojana
Government of India rooftop solar subsidy — up to ₹78,000 to make solar more affordable.
The Government of India's PM Surya Ghar: Muft Bijli Yojana helps homeowners install rooftop solar systems with subsidies of up to ₹78,000, making solar energy more affordable and accessible.
Subsidy Benefits
| Solar System Size | Central Subsidy |
|---|---|
| 1 kW | ₹30,000 |
| 2 kW | ₹60,000 |
| 3 kW or Above | ₹78,000 |
Why Go Solar?
- 💰 Reduce electricity bills by up to 90%
- ☀️ Generate clean energy for 25+ years
- 🏡 Increase your property's value
- ⚡ Protection from rising electricity costs
- 🌱 Contribute to a greener future
Recommended System Size
| Monthly Electricity Usage | Recommended Solar Size |
|---|---|
| 0 – 150 Units | 1 – 2 kW |
| 150 – 300 Units | 2 – 3 kW |
| Above 300 Units | 3 kW+ |
Simple Process
- 1Apply on the PM Surya Ghar Portal.
- 2Get approval from your DISCOM.
- 3Install solar through an approved vendor.
- 4Complete inspection and net metering.
- 5Receive subsidy directly in your bank account.
Who Is Eligible?
- You are an Indian citizen residing in India
- You own a house with a rooftop suitable for solar panel installation
- You have a valid electricity connection in your own name
- You have not already availed a solar subsidy on the same electricity connection
- You have a bank account that can be linked for direct subsidy transfer
Exact eligibility and subsidy amounts are set by MNRE and your local DISCOM and can change — verify current details on the official PM Surya Ghar portal before applying. Sellers and installers on Arbit Energy can help confirm what applies to your connection.
Frequently Asked Questions
How much subsidy can I actually get under PM Surya Ghar?
Up to ₹30,000 for a 1 kW system, ₹60,000 for 2 kW, and ₹78,000 for 3 kW or above — see the subsidy table above. The exact amount depends on your system size and your DISCOM’s approval.
Do I need to buy from a government-approved vendor?
Yes — installation must be done through a vendor empanelled with your DISCOM/MNRE for the subsidy to be released. Ask any merchant or professional on Arbit Energy whether they hold this empanelment before you order.
How long does the subsidy process usually take?
It varies by DISCOM and state, typically a few weeks from application to net-metering approval and subsidy credit. Delays are usually on the DISCOM inspection/net-metering step, not the installation itself.
Can renters or housing societies apply?
The individual rooftop-owner scheme is meant for homeowners with their own electricity connection. Housing societies and group installations fall under separate MNRE guidelines — contact us and we can point you to the right process.
Need help with subsidy applications or solar installation? Arbit Energy provides complete assistance from consultation to commissioning.
Get Expert Help →